Friday, September 24, 2021

Front Spar

The first parts are under construction!  I started by clecoing the two front spars together using the doubler plate, then match drilled it all.  Even though the RV9A is a relatively small plane, the length of the spar for the tail was a bit surprising.


The next step is fabricating a couple of attach angles that will attach to the front spar.


Attached the attach brackets to the front spar and match drilled.


The last step for today was to cleco and match drill the hinge brackets to the rear spar.