Sunday, February 20, 2022

Right Wing - Tank (4)

Lots and lots of drilling on the fuel tank today.  I match drilled all of the rib to skin holes, as well as the baffle.  Then I countersunk all of the holes in the baffle/skin holes and enlarged the holes along the edge for the screws that attach to the spar.


The platenuts for the inboard Z bracket get attached to the spar instead of onto the Z bracket.  I'd forgotten how big of a pain this was on the last tank.  I wish I had done these before I had riveted in all of the ribs.  There is very little room, plus there's a doubler underneath that makes bucking really difficult.


I started prepping the Z brackets for the platenuts using a jig to drill all of the holes.

I had to pause there, because I can't seem to find all of the platenuts I need for the brackets.  If I have to order more, I'll probably just go ahead and order a bunch of various hardware.  I can't exactly get this stuff locally, so just being short one bolt means $5 in shipping.  I'll get some of the most commonly used nuts and bolts, platenuts, washers, etc and hopefully have enough to spare throughout the build.