I continued working on riveting the side skins today. On the right side I got done with the main bulkhead skin rivets, as well as most of the other forward fuselage pieces. I still have to do the larger 4- rivets for the gear attach web.. I am going to wait and do the rivets at the bottom portions and the main longeron until I flip the fuselage over.
The left side is a little behind the right. I still have the vertical 902 bulkhead rivets and gear attach web to do.